Providing exceptional geotechnical engineering and
construction materials testing services since 1989...
Palmerton & Parrish, Inc.
  • Home
  • Services
    • Geotechnical Engineering
    • Subsurface Drilling
    • Construction Materials Testing
    • Laboratory Testing
    • Environmental Services
    • Geophysical Services
    • Specialty Services
  • Portfolio
  • About
    • History
    • Board of Directors
    • Careers
  • Contact
  • News

Hospitality and Leisure

PPI’s broad range of services is showcased on many of our larger Hospitality and Leisure Projects, as PPI is often involved with Hospitality and Leisure Projects from the early planning stages through project completion.  Representative Hospitality and Leisure Projects include:

  • Big Cedar Lodge; Ridgedale, MO;
  • Branson Landing Development and Branson Landing North; Branson, MO;
  • Cherokee Nation Casino; Will Rogers Downs; Claremore, OK;
  • Dogwood Canyon; Lampe, MO;
  • Downstream Casino Resort; Quapaw, OK;
  • Farmers Park; Springfield, MO;
  • Hammons Field, St. Louis Cardinals AA Affiliate; Springfield, MO;
  • Hampton Inn, Battlefield Road and Highway 65; Springfield, MO;
  • Indigo Sky Casino; Wyandotte, OK;
  • Shoppes at Branson Hills; Branson, MO;
  • South Dale Center; Lebanon, MO;

PPI has worked on multiple phases of development at the Branson Landing since 2004, including the recently completed retail stores at Branson Landing North.  The original Branson Landing development was a $300 million retail, condominium, and convention center development along Lake Taneycomo next to Historic Downtown Branson.  The Project included construction of a seawall, founded on a reinforced rock fill on top of alluvial soils, and approximately 2,000 lineal feet of 14-foot tall retaining wall to raise the elevation of the retail and condominium buildings.

PPI has provided Environmental, Geotechnical Engineering, and Construction Materials Testing Services for the Quapaw Tribe of Oklahoma under the care of the Downstream Development Authority since 2007.  PPI’s first involvement with the Downstream Casino Resort was a Phase I Environmental Site Assessment of the then undeveloped property located at the Tri-State Intersection of Missouri, Oklahoma, and Kansas.

PPI was then retained to provide a Peer Review of the Geotechnical Engineering Report for the original 12-story tower, and took over as the Geotechnical Engineer of Record for the Project.  PPI has served as the Geotechnical Engineer of Record and Construction Materials Testing Firm for the second Tower at Downstream, numerous ancillary facilities in support of the Downstream Casino Resort, the Q Store at the roundabout entrance to the Resort, and facilities in the City of Quapaw including the Elders Housing Development, the Health and Welfare Clinic, and a new Convenience Store.

The Track – Navy Pier Ferris Wheel – Branson, MO
Branson Landing
Downstream Casino – Second Tower Construction

 

Bass Pro Cave 2
Geologic Evaluation - Ridgedale, Missouri
2016 - Track Ferris Wheel Big
Navy Pier Ferris Wheel - The Track
Dogwood - Tiered Walls - Use (2)
Dogwood Canyon - Retaining Wall
Bordertown Casino - crop
Indigo Sky Casino - Foundation Pre-Drilling
Downstream Aerial
Downstream Casino
slider
Downstream Casino - Drilled Pier Construction
Landing Retaining Wall
Branson Landing - Boardwalk Wall
branson-landing
Branson Landing - Subgrade Stabilization
Landing Drilled Pier
Branson Landing - Drilled Pier Construction

Healthcare Education

Springfield, Missouri
4168 W. Kearney St.
Springfield, Missouri 65803
Ph.: (417) 864-6000

Joplin, Missouri
3500 East 13th Street
Joplin, Missouri 64801
Ph.: (417) 624-2005

Branson, Missouri
10,000 Hwy. 160
Walnut Shade, MO 65771
Ph.: (417) 561-8395

Copyright © 2021 Palmerton & Parrish, Inc.
Designed by: Global Web Design